The National Planning Policy Framework (NPPF) requires most development to undergo the National Permit Register (NPPR) process before it can be built. In certain circumstances, an applicant may be eligible for an exemption or a compliance certificate. This page explains the legal basis, eligibility criteria, the steps involved, and bestpractice tips for preparing a successful application.
An NPPR exemption removes the requirement to obtain a formal planning permission for development that falls within a predefined set of minor works. The exemption is automatically granted when the proposed development meets the conditions set out in Schedule 1 of the Town and Country Planning (General Permitted Development) Order (GPDO) and any relevant local planning policies.
A compliance certificate is a formal document issued by the local planning authority (LPA) confirming that a development, which has already been carried out, complies with the conditions of the NPPR or an exemption. It is often required when a property is being sold, mortgaged, or when a subsequent development depends on proof of prior compliance.
Both exemptions and compliance certificates are subject to the same fundamental tests:
Use the Planning Portal's Permitted Development Rights checker or consult your LPAs website. Keep a record of the specific paragraph of the GPDO that applies.
Even though an exemption does not require formal permission, the LPA may request evidence:
| Document | Purpose |
|---|---|
| Scaled site plan | Show location of work relative to property boundaries |
| Elevations & floorplans | Demonstrate dimensions and design compliance |
| Photographs (pre and postwork) | Provide visual proof of the finished development |
| Structural calculations (if required) | Validate safety for extensions or loft conversions |
| Evidence of prior notification | For works that need formal notice (e.g., larger solar arrays) |
Most LPAs accept online submissions via their eplanning portal. Required fields usually include:
Pay any applicable fee (usually nominal for exemptions, higher for compliance certificates).
The authority has 21 days to respond to a compliance certificate request and up to 28 days for an exemption notice. They may request additional information; respond promptly to avoid delays.
Tip: Always doublecheck the most recent version of the GPDO and your local plan before submitting. Regulations change, and a small variance can invalidate an exemption.
No, an architect is not mandatory for most exemptions. However, for complex works (e.g., loft conversions, structural alterations) a qualified professional can produce accurate drawings and calculations, increasing the chance of success.
Yes. If the LPA refuses an exemption or compliance certificate, you have the right to appeal to the Planning Inspectorate within 21 days of the decision. The appeal must include all original submission material and any new evidence.
Certificates do not expire, but they are only valid for the specific development described. If you later alter the work, a new certificate may be required.
Fees vary by authority. Typical exemption confirmation fees range from 030. A compliance certificate can cost between 100300, depending on the complexity and required inspections.
Following these steps will help you navigate the NPPR exemption or compliance certificate process efficiently, minimise delays, and avoid unnecessary costs. If you are ever unsure, seeking advice from a planning consultant or an architect experienced with permitteddevelopment applications can save time and give peace of mind.