The Burrowes Renovation Project is a comprehensive residential makeover undertaken in the historic district of Oakridge. The goal of the renovation is to preserve the original character of the early20thcentury townhouse while introducing modern comforts, energy efficiency, and openplan living spaces. The project was launched in March 2024 and is scheduled for completion by October 2025. The faade will be carefully stripped of nonoriginal paint layers, repainted in a historically accurate palette, and repaired where timber has rotted. Original window frames will be refurbished with lowE glass that meets modern thermal standards. Following a structural engineers assessment, the foundation will be reinforced with steel pilings, and roof trusses will be upgraded to support the solar array. All work complies with the local heritage preservation ordinance. The secondfloor bedroom walls are being removed to form a master suite with a walkin closet and a bathroom featuring a freestanding tub. A new halfbath is added on the ground floor for guests. A ductless heatpump system will replace the aging forcedair furnace, reducing energy consumption by an estimated 35%. New plumbing lines are run in PEX, allowing for flexible routing and resistance to corrosion. Natural wood flooring will be installed in living areas, while reclaimed brick will serve as an accent wall in the kitchen. All lighting fixtures are LED and dimmable, sourced from local artisans to reflect the homes historic feel. The total projected cost is $1.85million, allocated as follows: Funding is sourced from a combination of private equity, a historic preservation grant, and a greenenergy incentive program. By integrating solar photovoltaics and a heatpump system, the renovation reduces the buildings annual CO emissions by an estimated 45%. The use of reclaimed materials for interior accents minimizes waste, and all construction waste is recycled at a rate of 90%. Successful delivery relies on close coordination among: Upon completion, the Burrowes Residence will serve as a model for integrating historic preservation with sustainable design. The projects documentation will be shared with local trade schools, and a case study will be submitted to the National Trust for Historic Preservation. For updates, follow the projects blog or contact the project manager, Jane Doe.Burrowes Renovation Project
Project Overview
Key Objectives
Scope of Work
Exterior Restoration
Structural Improvements
Interior Layout
Mechanical, Electrical, & Plumbing (MEP)
Finishes & Fixtures
Project Timeline
Phase Start End Key Milestones Planning & Permits Mar2024 Jun2024 Design approval, heritage clearance, permit acquisition Demolition & Structural Work Jul2024 Sep2024 Foundation reinforcement, roof framing, exterior restoration RoughIn MEP Oct2024 Dec2024 HVAC ducts, electrical trunks, plumbing chases installed Interior Finishes Jan2025 Jun2025 Flooring, cabinetry, fixtures, paint Final Inspection & Handover Jul2025 Oct2025 Certificate of occupancy, owner walkthrough Budget Summary
Environmental Impact
Stakeholder Collaboration
Risks & Mitigation
Risk Potential Impact Mitigation Strategy Unforeseen structural damage Delay, cost overrun Conduct thorough predemolition surveys; allocate contingency budget Supply chain disruptions for historic windows Delay Identify multiple qualified fabricators; preorder critical components Regulatory changes to energy incentive programs Reduced funding Lock in incentives early; design flexibility to incorporate alternative savings measures Future Outlook