The Task Scope of Work (SOW) for the Leaking Petroleum Underground Storage Tank (LUST) Cleanup Fund outlines the responsibilities, deliverables, and performance criteria required to manage and remediate contaminated sites funded under the federal program. The SOW serves as a contract reference for state and tribal agencies, private contractors, and other stakeholders involved in the investigation, design, construction, and closure of LUST sites. Activities: Review historical records, conduct site visits, and evaluate preliminary data (e.g., soil and groundwater samples). Assign a priority ranking based on risk, exposure pathways, and remedial complexity. Deliverables: Detailed investigation work plan, field data collection (soil borings, groundwater monitoring wells, vapor surveys), laboratory analysis, and a comprehensive Investigation Report. Tasks: Develop a Remedial Action Plan (RAP) that includes selected remedial technologies, design specifications, cost estimates, and a schedule. The RAP must receive EPA or authorized state approval before construction. Assist the responsible party in obtaining all necessary permits (e.g., NPDES, air emissions, solid waste disposal) and ensure compliance with applicable federal, state, and tribal regulations. Scope: Execute remedial actions such as soil excavation, pumpandtreat systems, insitu chemical oxidation, or vapor extraction. Provide progress reports, qualitycontrol documentation, and field verification records. Develop a monitoring plan to assess the effectiveness of the remedy. Collect postconstruction data at defined intervals and compare results against cleanup criteria. Prepare a Performance Evaluation Report. Compile final site closure documentation, including the Closure Report, asbuilt drawings, operation and maintenance manuals, and a sitespecific Institutional Controls (if required). Submit all documents for regulatory acceptance. Track expenditures, prepare quarterly cost reports, and ensure that all work stays within the allocated LUST Cleanup Fund budget. Conduct a final financial audit at project closeout. The following metrics will be used to evaluate contractor performance: Regular reporting ensures transparency and enables early identification of issues. Required reports include: All laboratory analyses must be performed by EPAapproved labs using standard methods (e.g., EPA 8260 for VOCs). Field QA/QC includes duplicate samples, field blanks, and chainofcustody procedures. Contractors shall submit a QA/QC plan for review and adopt corrective actions when data fall outside acceptable limits. Contractors must develop an HSE Plan that addresses personnel protective equipment, spill prevention, waste handling, and emergency response. All work must comply with OSHA standards, the EPAs Hazardous Waste Regulations, and any applicable state or tribal HSE statutes. Any modifications to the original SOWwhether scope, schedule, or costmust be documented through a formal Change Order. The Change Order requires justification, impact analysis, and approval by both the fund administrator and the state program. For questions regarding the LUST Cleanup Fund SOW, please contact the program manager at:Leaking Petroleum Underground Storage Tank (LUST) Cleanup Fund Task Scope of Work (SOW) Document
Purpose of the Document
Key Objectives
Scope of Work Elements
1. Site Screening and Prioritization
2. Investigative Phase
3. Remedial Action Planning
4. Permitting and Regulatory Coordination
5. Construction and Implementation
6. Monitoring and Performance Evaluation
7. Closure and Documentation
8. Financial Management
Roles and Responsibilities
Performance Metrics
Reporting Requirements
Quality Assurance/Quality Control (QA/QC)
Health, Safety, and Environmental (HSE) Requirements
Change Management
Contact Information
Phone: (555) 1234567
Email: lustfund@epa.gov